质量部控制计划如何编写才更实用?

对产品控制质量工程师来说,公司的Dfmea、Pfmea和Cp一直不能有效的统一,成为外审员关注的焦点。请大家发表自己的看法,控制计划如何做才能更有效,更能让进货检验、过程和最终检验员包括操作者能够按照合理的要求做呢?另外抽样方法再不能实施2828的情况下如何确定呢?
谢谢!以下cp仅供FYI。
Process control plan****************************************************************************  Trial run Mass production  Key connect /phoneDate(Orignal)VersionDate(Revise) Control plan Nuber      2002.07.04V1.0  Part Number/Latest change levelCore teamPrepared by:  3K5P41/11H  Part Name DescriptionSupplier/plant/Approal dateConfirmed by: 3K5P41/11H PCB Assembly  **Supplier/Plant
Supplier codeOther approval date(if request)
  Inpection AreasPart/Process NumberProcess Name/ Operation DescriptionMaterialsMachine Device.jig. Tools for MfgCharacteristics to control MethodsReaction PlanResp.Applicable DocumentGoalCommentsNoProductProcess*key characteristicProduct/Process inspection/ ToleranceEvaluation Measurement TechniqueSampleControl methodsizefreqPre-processPlasticMaterial checkcomponent/1check material 12NC&spec.check material 12NC&spec. according to SUB material listinspection by visual1every shift every material feedingMaterial feeding recordOperation will stop when found out of mix. material on stationOperatorSUB material summary FOR≤400ppm Plasticn/splastic machine2 plastic qualitymachine parameter settingvsample (bare pcb)/check standardinspection by visual10every batchcheck listOperation will stop when found out the plastic quality can't according with SOP.Operatorcheck standard/SOP ShapeMaterial checkcomponent/1check material 12NC&spec.check material 12NC&spec. according to SUB material summary listinspection by visual1every shift
every material feedingMaterial feeding recordOperation will stop when found out of mix. material on stationOperatorSUB material summary  Shapen/spunch / mould2insertion qualitycorrect using die sample (bare pcb)/check standardinspection by visual10every shift every material feedingdie process check listOperation will stop when found out the insertion quality can't according with SOP.Operatorcheck standard/SOP the lead's length out of pcbcorrect using die the lead's length out of the pcb:2.5+/-0.5mmtry on insert in bare pcb measure by callipers10every shift every material feedingdie process check listOperation will stop when found out the lead length out Spec. and inform PE.Operatorcheck standard/SOP Shape as "L" Heatsink assembleddaub grease siliconesunk fence Heatsink 、grease siliconebrush1daub locationinspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordOperator will rework when found out the doub location and quality poor.OperatorSOP daub qualityinspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordSOP paste insulating plateinsulating plate/2insulating plate missinginspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordOperator will rework when found out the insulating plate missing.OperatorSOP install electric crystalelectric crystal、springfixture3assembly qualityinspection by visual manual according to SUB material summary inspection by visual1every shift every material feeding FAI recordOperator will rework when found out the assembly quality poor..OperatorSOP spring tighteninspection by visual according to checking spec.inspection by visual1every shift every material feeding FAI recordSOP the lead's length out of pcbcorrect using die according to SOPtry on insert in bare pcb measure by callipers5every shift every material feeding FAI recordOperation will stop when found out the lead length out Spec. and inform PE.OperatorSOP Power heatsink assemblydaub grease siliconeelectric crystal、grease siliconebrush1daub locationinspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordOperator will rework when found out the doub location and quality poor.OperatorSOP daub qualityinspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordSOP paste insulating plateinsulating plate/2insulating plate missinginspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordOperator will rework when found out the insulating plate missing.OperatorSOP install electric crystalelectric crystal、grease siliconefixture3spring tighteninspection by visual according to checking spec.inspection by visual1every shift every material feeding FAI recordOperator will rework when found out the assembly quality poor..OperatorSOP the lead's length out of pcbcorrect using die according to SOPtry on insert in bare pcb measure by callipers5every shift every material feeding FAI recordSOP Vertical heatsink assemblydaub grease siliconeFrame heatsink、grease siliconebrush1daub locationinspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordOperator will rework when found out the doub location and quality poor.OperatorSOP daub qualityinspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordSOP paste insulating plateinsulating plate/2insulating plate missinginspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordOperator will rework when found out the insulating plate missing.OperatorSOP install electric crystalelectric crystal、
springfixture3spring tighteninspection by visual according to checking spec.inspection by visual1every shift every material feeding FAI recordOperator will rework when found out the assembly quality poor..OperatorSOP the lead's length out of pcbcorrect using die fixture number:NO.Z17.1~4,the lead's length out of the pcb:2.5+/-0.5mmtry on insert in bare pcb measure by callipers5every shift every material feeding FAI recordSOP install cannula to resistanceinstall cannula to resistancecannula、resistance/1material 12NC/spec.inspection by visual according to SUB material listinspection by visual1every shift every material feedingMaterial feeding recordOperation will stop when found out of mix. material on stationOperatorSUB material summary  assembly qualityinspection by visual according to SOPinspection by visual1every shift every material feeding FAI recordOperator will rework when found out the assembly quality poor.OperatorSOP lead cutting lengthmanual the lead's length out of the cannula: 1.5-2.0mminspection by visual5every shift every material feeding FAI recordOperator will rework when found out the the lead cutting length can't according with SOP.OperatorSOP CPU program LoadingCPU program LoadingCPUCPU program Loading machine1material 12NC/spec.IC spec. WP62P2inspection by visual1every shift every material feedingCPU check listOperation will stop when found out of mix. material on stationOperatorCPU program summary list label according to SOPinspection by visual1every shift every material feedingCPU check listCPU program summary list 2program program namevaccording to the cpu program listinspection by visual1every shift every material feedingCPU check listOperation will stop when found out the program and check sum can't match with SOP.OperatorCPU program summary list CHECK SUMvaccording to the cpu program listCHECK SUM10every shift every material feedingCPU check listCPU program summary list EEPROM program loadingEEPROM program loadingEEPROM ICEEPROM program loading machine1material 12NC/spec.IC spec. 24C16inspection by visual1every shift every material feedingEEPROM check listOperation will stop when found out of mix. material on stationOperatorEEPROM program summary list label according to SOPinspection by visual1every shift every material feedingEEPROM check listEEPROM program summary list 2program program namevaccording to the eeprom data listinspection by visual1every shift every material feedingEEPROM check listOperation will stop when found out the program and check sum can't match with SOP.OperatorEEPROM program summary list CHECK SUMvaccording to the eeprom data listCHECK SUM10every shift every material feedingEEPROM check listEEPROM program summary list "█" =Material Input, "◇"=Pre-Process, "◎"=Pre-ass'y ,"○"=Alignment , "△"=Checking ,"●"=Package *with mark "V" means key characteristic  
对“好”的回答一定要点个"赞",回答者需要你的鼓励!
已邀请:

baeeeeyygy (威望:1) (江苏 苏州) 电子制造 主管

赞同来自:

控制计划对公司来说非常重要,
首先是明确产品或服务的流程,
通过宏观流程图, 流程图,工艺细图将输入,输出找出来,
再根据人,机,物,环,法,测,控制计划就一目了然了.