Though similar, there is a fundamental and philosophical difference between the two. While PDCA is continuous and never supposed to end, DMAIC is project oriented and sequentially executed from the beginning to the end.
PDCA is used in TQM; and DMAIC is conducted in Six Sigma.
22 个回复
洛客 (威望:13) (海外 海外) 咨询业 总监
赞同来自:
PDCA is used in TQM; and DMAIC is conducted in Six Sigma.