2008的TS外审不符合项
1 S15 Purchasing process:
At Purchasing department , the purchasing activities were monitored with approval vendor list and related purchasing orders. But the quality management system certificate (third party) was not available for some approved vendors, e.g. Shandong Weijiao, the raw material (cast iron) suppliers.
2 C3 APQP process:
For the engineering change of the P/N# 19911240009,the new process,dynamic balance test,is added to the manufacturing process. But the related control plan was not updated. Also the some process monitoring methods were not applicable,e.g. forming process use visual check.
3 S5 Product monitoring process:
1、At first article inspection,the dimension result (diameter 127+/-0.5mm) was not recorded in the IPQC records sheet, 06/08/2008.
2、At final inspection (P/N#3053210401) ,the inspection tools were not defined,e.g.caliper for the chamber 2×45 degree and roughness tester for the texture (3.2a) requirement.
At Purchasing department , the purchasing activities were monitored with approval vendor list and related purchasing orders. But the quality management system certificate (third party) was not available for some approved vendors, e.g. Shandong Weijiao, the raw material (cast iron) suppliers.
2 C3 APQP process:
For the engineering change of the P/N# 19911240009,the new process,dynamic balance test,is added to the manufacturing process. But the related control plan was not updated. Also the some process monitoring methods were not applicable,e.g. forming process use visual check.
3 S5 Product monitoring process:
1、At first article inspection,the dimension result (diameter 127+/-0.5mm) was not recorded in the IPQC records sheet, 06/08/2008.
2、At final inspection (P/N#3053210401) ,the inspection tools were not defined,e.g.caliper for the chamber 2×45 degree and roughness tester for the texture (3.2a) requirement.
没有找到相关结果
已邀请:
7 个回复
cjq0308@163.com (威望:1) (山东 潍坊) 机械制造 员工 - 漫漫质量路
赞同来自:
我是把他拿出来与大家共享一下,,以及以后如何避免,并举一反三