TS条款 4.2.3.1 工程规范 如何理解?
请问下面的条款如何执行?
谢谢~
4.2.3.1 Engineering specifications工程规范
The organization shall have a process to assure the timely review, distribution and implementation of all customer engineering standards/specifications and changes based on customer-required schedule. Timely review should be as soon as possible, and not exceed two working weeks.
组织必须建立过程以确保按照顾客要求的进度及时评审、发放和实施所有的顾客工程标准/规范和更改。及时评审应该尽可能快地进行,并且不应该超过两个工作周。
谢谢~
4.2.3.1 Engineering specifications工程规范
The organization shall have a process to assure the timely review, distribution and implementation of all customer engineering standards/specifications and changes based on customer-required schedule. Timely review should be as soon as possible, and not exceed two working weeks.
组织必须建立过程以确保按照顾客要求的进度及时评审、发放和实施所有的顾客工程标准/规范和更改。及时评审应该尽可能快地进行,并且不应该超过两个工作周。
没有找到相关结果
已邀请:
11 个回复
frankeywang (威望:1607) (湖北 武汉) 电子制造 总监
赞同来自: