我的一个项目,大家给点意见
供应商 检验单编号 检验接收时间 开始检验时间 完成检验时间 等待时间 实际检验时间 检验周期 备注
A 2012868 2/14/2011 2/21/2011 2/21/2011 7 0 7
B 2012872 2/15/2011 2/15/2011 2/15/2011 0 0 0
C 2012827 2/15/2011 2/15/2011 2/15/2011 0 0 0
D 2012873 2/15/2011 2/20/2011 2/21/2011 5 1 6
G 2012877 2/15/2011 2/15/2011 2/15/2011 0 0 0
E 2012875 2/15/2011 2/15/2011 2/16/2011 0 1 1
A 2012874 2/15/2011 2/15/2011 2/15/2011 0 0 0
B 2012887 2/16/2011 2/18/2011 2/19/2011 2 1 3
C 无 2/16/2011 2/16/2011 2/17/2011 0 1 1
E 2012886 2/17/2011 2/17/2011 2/17/2011 0 0 0
S 2012906 2/17/2011 2/18/2011 2/21/2011 1 3 4
G 2012901 2/17/2011 2/19/2011 2/19/2011 2 0 2
A 2012868 2/14/2011 2/21/2011 2/21/2011 7 0 7
B 2012872 2/15/2011 2/15/2011 2/15/2011 0 0 0
C 2012827 2/15/2011 2/15/2011 2/15/2011 0 0 0
D 2012873 2/15/2011 2/20/2011 2/21/2011 5 1 6
G 2012877 2/15/2011 2/15/2011 2/15/2011 0 0 0
E 2012875 2/15/2011 2/15/2011 2/16/2011 0 1 1
A 2012874 2/15/2011 2/15/2011 2/15/2011 0 0 0
B 2012887 2/16/2011 2/18/2011 2/19/2011 2 1 3
C 无 2/16/2011 2/16/2011 2/17/2011 0 1 1
E 2012886 2/17/2011 2/17/2011 2/17/2011 0 0 0
S 2012906 2/17/2011 2/18/2011 2/21/2011 1 3 4
G 2012901 2/17/2011 2/19/2011 2/19/2011 2 0 2