Thought Process Map for Six Sigma: What, Why and How
For a Six Sigma project to have the greatest chance of success, it must begin with a solid foundation. One tool that can ensure a firm foundation is the thought process map, sometimes referred to as a TMAP or TPM.
By http://www.isixsigma.com/index ... uthor
For a Six Sigma project to be successful, it must begin with a solid foundation. One tool that can ensure a firm foundation is the thought process map, sometimes referred to as a TMAP or TPM.
A TMAP is a visual representation of a Black Belt's, team leader's or an entire team's thoughts, ideas and questions relative to accomplishing the project goal. It should be one of the first tools employed when starting any Six Sigma or process improvement project. A TMAP presents a structure of information and helps a team progress through the DMAIC process. It is a living document that will change throughout the project and has no set format. A TMAP can be used to drive specific actions and select the Six Sigma tools that should be employed.
A TMAP should include, but is not limited to:1. The project goal(s) or problem statement(s) 2. Specific areas/parts of a process to be analyzed 3. Any issues or questions to address 4. What is known about those issues or questions 5. What is not known about those issues or questions 6. Initial assumptions about each issue or question. 7. What data or information is needed 8. Potential barriers reaching the project goal 9. Interconnections between each part/issue/question 10. Potential Six Sigma tools to be used
When creating a TMAP, the only wrong piece of information is the one left out. Why Should the TMAP Be Used?
The single, most important benefit of using a TMAP early in a project is it ensures that nothing is left out or missed. It is an effective tool for ensuring all potential questions and issues of a project have been both identified and addressed from the beginning of a project to completion.
It also provides an effective way to brainstorm, take notes, gather and view information and even summarize data. It reminds the team what assumptions were made, the actions that followed, and the latest status of the project. It is an effective way of communicating, as well as consolidating information from a single person or among various teams.
Finally, it provides a visual map that tracks the development of ideas and issues, as well as the extent of inquisition. Like all maps, it shows where the team or individual has been, where they are at, and where they need to go in pursuit of resolution to particular issues.
How to Create a Thought Process MapThere are various ways to create a TMAP, but the easiest and most effective way is following these five steps:1. Define the project goal(s) 2. List the knowns and unknowns 3. Ask DMAIC questions and "grouped" questions 4. Sequence and link the questions 5. Identify possible tools to be used
Before Making a TMAPIn preparation for making a thought process map, here are a few recommendations:> Use large (about 2x2.5-foot) easel pads or poster board. This allows information to be viewed easily.
> Use different colored markers - allowing different colors for knowns, unknowns, questions, etc.
> Use Post-its - these will allow information to be grouped/moved around the map more easily.
> Involve the entire team - the more input the better and do not exclude anyone or any information.
> Do not critique - just gather as much information as possible and filter it later.
> Do not make initial (i.e., false) assumptions. If the data is unknown, list it as so and research it later.
Here then, is how these five steps can be used to create a TMAP. Step 1: Define the Project Goal(s)First and foremost, a team needs to clearly define the goal. What is the team trying to accomplish? Is it a problem that needs to be solved? Is it a potential opportunity for growth that needs to be explored? By defining the goal, the team also will define the project scope. This is essential to do early on in a project. Referencing the project charter (the document that formally recognizes a Six Sigma project, identifies the scope, includes a problem statement, objective, benefits, team members, process owner and Champion) is very helpful in this step, as it should contain the goal or problem statement of the project.At this point, someone on the team write the goal or problem statement at the top of a large poster board or easel pad. And the TMAP is begun. The other four steps will be put on the board or pad below the initial statement. For this example, a generic problem can be used to clearly illustrate all the steps. Here is a common problem encountered in the manufacturing world:"The receipt and processing of delivered materials takes too much time."Step 2: List the Knowns and UnknownsFor this step, it is most helpful to simply create two columns - one for what the team knows and one for what the team does not know. It might be surprising how much information is known, but even more surprising how much the team does not know.Information can include, but is not limited to metrics, times, costs, issues, potential barriers, points-of-contact, current problems, customer requirements, outputs, inputs, process steps, quantities and locations.
Knowing pertinent information and data in the initial stages is important; however, equally important is realizing what data the team will need to research.So, as the building of the TMAP continues, two columns are created off to the side (Figure 1). The items in each column - knowns and unknowns - are written on sticky paper.
Figure 1: What Is Known and Not Known
Step 3: Ask DMAIC Questions and 'Grouped' QuestionsThis step coincides closely with the previous step. Team members will recognize that their unknowns (from Step 2) and questions from this step are very similar. The main difference is the approach. Using two separate approaches allows very different pieces of information and questions to surface. In the previous step, the team is stating inquiries from the perspective that they simply do not know a vital piece of information. In this step, they are asking questions from both the DMAIC approach, as well as a grouped approach.First, ask questions from the categorical perspectives of DMAIC: Define, Measure, Analyze, Improve and Control. These will be the five areas into which all questions will be categorized. It is important to ask as many questions as possible - this is really a brainstorming exercise and no question is a bad question. So, again using sticky paper, some common questions are shown in Figure 2.
Figure 2: Questions from a DMAIC Perspective
Next, the team needs to ask questions from the perspective of groups that are within or affect the process (Figure 3).
Figure 3: Questions from Group Perspectives
Step 4: Sequence and Link the QuestionsNow it all comes together. Sequence questions below the problem statement (or goal) and flow them down. Additionally, link questions that are related to each other. The team members will find in this step that they will generate many additional questions. An example of a basic TMAP may look like the illustration in Figure 4.
Figure 4: Example of a Basic TMAP
This TMAP is a fairly simple example. Obviously many questions, sub-groups and links could yet be added. The complexity of any TMAP is dependent upon the complexity of the process, as well as the depth of the project team's analysis.Step 5: Identify Possible Tools to Be UsedFinally, the project team should identify the potential Six Sigma tools to be used to answer the questions posed. The most effective way to perform this step is to create a four-column matrix, as illustrated in the table below. It should have a column for the question, the tool or method, who is responsible, and the due date.
Matrix for Identify Potential Six Sigma Tools/Methods
Question
Tool/Method
Person Responsible
Due Date
How long and how many people does the transportation steps take?
Value Stream Map
How long and how many people does the process steps take?
Value Stream Map
Where are our failure modes?
FMEA
How is the material inspected?
MSE
Percentage of small packages versus large packages?
Data Analysis
And with this table, the TMAP process is complete, and the Six Sigma project is off to a strong start.Another Interesting Form for a TMAPAnother common format for a TMAP is using a bubble diagram as illustrated in Figure 5. This format often works better for processes that have many links. The five-step process can still be used to create it. Format is not significant as long as the TMAP helps the team in achieving its objective of a successful Six Sigma project.
Figure 5: TMAP as a Bubble Diagram
About the Author: _Chris Schweighardt__ is a manager of quality projects and analysis in the manufacturing and aerospace industry in Los Angeles, California, USA. He has a key role in the deployment of Six Sigma and Lean projects. He has nine years of experience in process improvement, project management and analysis. Mr. Schweighardt has occupied technical and managerial positions in consulting, program management, manufacturing, quality, operations, finance and supply chain management. He can be reached at mailto:chrissch9674@yahoo.com _
你好,我是小编H。请对以下文章有翻译兴趣的组员留下你的预计完成时间,并发短信息或邮箱 mailto:xbH@6sq.net联系小编H,以便小编登记翻译者信息以及文章最终完成时的奖惩工作。原文有大量图表,请翻译者务必联系小编,以便把原文文档发到翻译者邮箱~~~
Thought Process Map for Six Sigma: What, Why and How
For a Six Sigma project to have the greatest chance of success, it must begin with a solid foundation. One tool that can ensure a firm foundation is the thought process map, sometimes referred to as a TMAP or TPM.
By http://www.isixsigma.com/index ... uthor
For a Six Sigma project to be successful, it must begin with a solid foundation. One tool that can ensure a firm foundation is the thought process map, sometimes referred to as a TMAP or TPM.
A TMAP is a visual representation of a Black Belt's, team leader's or an entire team's thoughts, ideas and questions relative to accomplishing the project goal. It should be one of the first tools employed when starting any Six Sigma or process improvement project. A TMAP presents a structure of information and helps a team progress through the DMAIC process. It is a living document that will change throughout the project and has no set format. A TMAP can be used to drive specific actions and select the Six Sigma tools that should be employed.
A TMAP should include, but is not limited to:1. The project goal(s) or problem statement(s) 2. Specific areas/parts of a process to be analyzed 3. Any issues or questions to address 4. What is known about those issues or questions 5. What is not known about those issues or questions 6. Initial assumptions about each issue or question. 7. What data or information is needed 8. Potential barriers reaching the project goal 9. Interconnections between each part/issue/question 10. Potential Six Sigma tools to be used
When creating a TMAP, the only wrong piece of information is the one left out. Why Should the TMAP Be Used?
The single, most important benefit of using a TMAP early in a project is it ensures that nothing is left out or missed. It is an effective tool for ensuring all potential questions and issues of a project have been both identified and addressed from the beginning of a project to completion.
It also provides an effective way to brainstorm, take notes, gather and view information and even summarize data. It reminds the team what assumptions were made, the actions that followed, and the latest status of the project. It is an effective way of communicating, as well as consolidating information from a single person or among various teams.
Finally, it provides a visual map that tracks the development of ideas and issues, as well as the extent of inquisition. Like all maps, it shows where the team or individual has been, where they are at, and where they need to go in pursuit of resolution to particular issues.
How to Create a Thought Process MapThere are various ways to create a TMAP, but the easiest and most effective way is following these five steps:1. Define the project goal(s) 2. List the knowns and unknowns 3. Ask DMAIC questions and "grouped" questions 4. Sequence and link the questions 5. Identify possible tools to be used
Before Making a TMAPIn preparation for making a thought process map, here are a few recommendations:> Use large (about 2x2.5-foot) easel pads or poster board. This allows information to be viewed easily.
> Use different colored markers - allowing different colors for knowns, unknowns, questions, etc.
> Use Post-its - these will allow information to be grouped/moved around the map more easily.
> Involve the entire team - the more input the better and do not exclude anyone or any information.
> Do not critique - just gather as much information as possible and filter it later.
> Do not make initial (i.e., false) assumptions. If the data is unknown, list it as so and research it later.
Here then, is how these five steps can be used to create a TMAP. Step 1: Define the Project Goal(s)First and foremost, a team needs to clearly define the goal. What is the team trying to accomplish? Is it a problem that needs to be solved? Is it a potential opportunity for growth that needs to be explored? By defining the goal, the team also will define the project scope. This is essential to do early on in a project. Referencing the project charter (the document that formally recognizes a Six Sigma project, identifies the scope, includes a problem statement, objective, benefits, team members, process owner and Champion) is very helpful in this step, as it should contain the goal or problem statement of the project.At this point, someone on the team write the goal or problem statement at the top of a large poster board or easel pad. And the TMAP is begun. The other four steps will be put on the board or pad below the initial statement. For this example, a generic problem can be used to clearly illustrate all the steps. Here is a common problem encountered in the manufacturing world:"The receipt and processing of delivered materials takes too much time."Step 2: List the Knowns and UnknownsFor this step, it is most helpful to simply create two columns - one for what the team knows and one for what the team does not know. It might be surprising how much information is known, but even more surprising how much the team does not know.Information can include, but is not limited to metrics, times, costs, issues, potential barriers, points-of-contact, current problems, customer requirements, outputs, inputs, process steps, quantities and locations.
Knowing pertinent information and data in the initial stages is important; however, equally important is realizing what data the team will need to research.So, as the building of the TMAP continues, two columns are created off to the side (Figure 1). The items in each column - knowns and unknowns - are written on sticky paper.
Figure 1: What Is Known and Not Known
Step 3: Ask DMAIC Questions and 'Grouped' QuestionsThis step coincides closely with the previous step. Team members will recognize that their unknowns (from Step 2) and questions from this step are very similar. The main difference is the approach. Using two separate approaches allows very different pieces of information and questions to surface. In the previous step, the team is stating inquiries from the perspective that they simply do not know a vital piece of information. In this step, they are asking questions from both the DMAIC approach, as well as a grouped approach.First, ask questions from the categorical perspectives of DMAIC: Define, Measure, Analyze, Improve and Control. These will be the five areas into which all questions will be categorized. It is important to ask as many questions as possible - this is really a brainstorming exercise and no question is a bad question. So, again using sticky paper, some common questions are shown in Figure 2.
Figure 2: Questions from a DMAIC Perspective
Next, the team needs to ask questions from the perspective of groups that are within or affect the process (Figure 3).
Figure 3: Questions from Group Perspectives
Step 4: Sequence and Link the QuestionsNow it all comes together. Sequence questions below the problem statement (or goal) and flow them down. Additionally, link questions that are related to each other. The team members will find in this step that they will generate many additional questions. An example of a basic TMAP may look like the illustration in Figure 4.
Figure 4: Example of a Basic TMAP
This TMAP is a fairly simple example. Obviously many questions, sub-groups and links could yet be added. The complexity of any TMAP is dependent upon the complexity of the process, as well as the depth of the project team's analysis.Step 5: Identify Possible Tools to Be UsedFinally, the project team should identify the potential Six Sigma tools to be used to answer the questions posed. The most effective way to perform this step is to create a four-column matrix, as illustrated in the table below. It should have a column for the question, the tool or method, who is responsible, and the due date.
Matrix for Identify Potential Six Sigma Tools/Methods
Question
Tool/Method
Person Responsible
Due Date
How long and how many people does the transportation steps take?
Value Stream Map
How long and how many people does the process steps take?
Value Stream Map
Where are our failure modes?
FMEA
How is the material inspected?
MSE
Percentage of small packages versus large packages?
Data Analysis
And with this table, the TMAP process is complete, and the Six Sigma project is off to a strong start.Another Interesting Form for a TMAPAnother common format for a TMAP is using a bubble diagram as illustrated in Figure 5. This format often works better for processes that have many links. The five-step process can still be used to create it. Format is not significant as long as the TMAP helps the team in achieving its objective of a successful Six Sigma project.
Figure 5: TMAP as a Bubble Diagram
About the Author: _Chris Schweighardt__ is a manager of quality projects and analysis in the manufacturing and aerospace industry in Los Angeles, California, USA. He has a key role in the deployment of Six Sigma and Lean projects. He has nine years of experience in process improvement, project management and analysis. Mr. Schweighardt has occupied technical and managerial positions in consulting, program management, manufacturing, quality, operations, finance and supply chain management. He can be reached at mailto:chrissch9674@yahoo.com _