求助:供应商考核 Manufacturing Site Assess
新客户要来工厂进行考察,预先给我们发来Manufacturing Site Assess Form。
其中几项不是太确定,所以来请教一下:
- Run at rate – is run at rate implemented for all PPAP’s
- Set up control - is the process of controlling set–ups , variation between set ups and within each set up defined for processes which are set up dependent
- Scheduling – are parts scheduled for production PPAP approved
这里的run at rate 和 set up分别具体指的什么?
谢谢各位!!
没有找到相关结果
已邀请:
1 个回复
东瓜豆腐 (威望:0) (广东 东莞)
赞同来自:
set up 是调机控制,每次调机是否进行验证是否对调机过程进行控制等