增加公式:Cpk or Ppk: Which should you use?

Cpk or Ppk: Which should you use?

Your customer has asked you to report the Cpk of the product you are sending. You know that to compute the Cpk, you need to have the product specifications, and that you need to have the mean and sigma. As you gather the information, someone asks, "which sigma do they want?"

You know that Cpk is calculated by dividing by 3 sigma. But which sigma should you use, estimated or calculated? Which is correct? Which would you report? Naturally, most of us would use the sigma that makes the Cpk look the best. But the sigma that makes the Cpk look best may not accurately reflect what you or your customer need to know about the process.

Confusion over calculating Cpk by two different methods is one reason that a new index, Ppk, was developed. Ppk uses the calculated sigma from the individual data.
Ppk=Zmin/3
where
Zmin=smaller of the Zupper , Zlower
Zupper=(USL-Xbar-bar)/sigma1
Zlower=(Xbar-bar-LSL)/sigma1

Sigma of the individuals:

sigma1square= ((Xi-Xbar)square/n-1)

Given that Ppk uses the calculated sigma, it is no longer necessary to use the calculated sigma in Cpk. The only acceptable formula for Cpk uses the estimated sigma.
Cpk=Zmin/3
where
Zmin=smaller of the Zupper,Zlower
Zupper=(USL-Xbar-bar)/sigma2
Zlower=(Xbar-bar-LSL)/sigma2

Estimated sigma:

sigma2=Rbar/D2

Given that Ppk uses the calculated sigma, it is no longer necessary to use the calculated sigma in Cpk. The only acceptable formula for Cpk uses the estimated sigma.

In 1991, the ASQC/AIAG Task Force published the "Fundamental Statistical Process Control" reference manual, which shows the calculations for Cpk as well as Ppk. These should be used to eliminate confusion about calculating Cpk.

So which value is best to report, Cpk or Ppk? Although they show similar information, they have slightly different uses.

Estimated sigma and the related capability indices (Cp, Cpk, and Cr) are used to measure the potential capability of a system to meet customer needs. Use it when you want to analyze a system's aptitude to perform.

Actual or calculated sigma (sigma of the individuals) and the related indices (pp, Ppk, and Pr) are used to measure the performance of a system to meet customer needs. Use it when you want to measure a system's actual process performance.

please speak out your ideas about this mind, thank you .
Mail:river.xu#mic.com.tw
对“好”的回答一定要点个"赞",回答者需要你的鼓励!
已邀请:

豫仁 (威望:0) (广东 佛山) 家电或电器 - Quality Management

赞同来自:

沒有壓力的學習往往是興趣,
很多單詞抄來的說,文章整理的說.
單詞忘完的說, 需要恆心的說.
,,,,,,的說,這為何成為風气.faint.

26 个回复,游客无法查看回复,更多功能请登录注册

发起人

豫仁
豫仁

Quality Management

扫一扫微信订阅<6SQ每周精选>