pre-control chart
what's the meaning of the second assumption in pre-control chart:process performance (including measurement system variability ) is less than or equal to the tolerance and why pre-control chart can not be used when Cp or Cpk greater than one?
question source from SPC.
question source from SPC.
没有找到相关结果
已邀请:
0 个回复