TS条款 4.2.3.1 工程规范 如何理解?
4.2.3.1 Engineering specifications工程规范
The organization shall have a process to assure the timely review, distribution and implementation of all customer engineering standards/specifications and changes based on customer-required schedule. Timely review should be as soon as possible, and not exceed two working weeks.
The organization shall have a process to assure the timely review, distribution and implementation of all customer engineering standards/specifications and changes based on customer-required schedule. Timely review should be as soon as possible, and not exceed two working weeks.
没有找到相关结果
已邀请:
2 个回复
wwz_13141314 (威望:1) (山东 威海) 汽车制造相关 经理 - fendou
赞同来自: