您还没有绑定微信,更多功能请点击绑定

R chart

MiniTAB帮助文件的xbar-R例题的解释不是很清楚,如何理解后面这句话?
Interpreting the results:
The center line on the X chart is at 600.23, implying that your process is falling within the specification limits, but two of the points fall outside the control limits, implying an unstable process. The center line on the R chart, 3.890, is also quite large considering the maximum allowable variation is +/-2mm, There may be excess variability in your process.
 
对“好”的回答一定要点个"赞",回答者需要你的鼓励!
已邀请:

龙天 (威望:137) (广东 广州) 互联网 6SQ管理员 - 我努力,我进步,我付出,我收获,我坚持,我成功!

赞同来自: 西格玛东一起学

参看 用6SQ统计做出来的,http://www.6sq.net/article/99728

2 个回复,游客无法查看回复,更多功能请登录注册

发起人

Jeff_Chou
Jeff_Chou

寄蜉蝣于天地 渺沧海之一粟

扫一扫微信订阅<6SQ每周精选>